Case Study

Client: Independent Producer

Location: Sutton County, TX

Challenge: This producer operates more than 1,000 gas wells, many of which are mature and producing more water. Before Greenwell, the water collected within the wellbore and reduced gas production.

Solution: Greenwell evaluated the field and designed a custom-blended chemical to unload the brine water from the wellbore and boost production.

Results: Average Gas Production:

Prior to Greenwell chemical program: 100 MCF/day
After Greenwell chemical program: 250 MCF-400MCF/day

Average Gas Production:

MCF/day

The chemical program boosted production more than 150% without installing new plunger lift systems or rod pumps.